Finovy

JinkoSolar Vietnam Production Base

  • Home
  • JinkoSolar Vietnam Production Base

JinkoSolar Vietnam Production Base

Customer Pain Points

 

Transformation Challenges

– Production line network delay 500ms
- Server downtime of 58 hours per year
– Operations team is overloaded

Our Solution

deployHuawei network equipment, Dell servers and somePCThe purchase of desktop computers provides reliable infrastructure network construction.

Technology Deployment

– Core network: Huawei S12700E+ optical modules
– Computing resources: Dell R750+VMware cluster 
– Security system: access control + behavior audit 

 

Key Metrics 

Dimensions 

Pre-Transformation 

Post-Transformation 

OEE 

68% 

82% 

MTTR 

4h 

0.5h 

TCO 

$1.2M 

$0.75M 

 

 

 

Project Information

Customer:

JinkoSolar

Category:

IT Technology

Date:

2024.08

CONTACT US NOW

You Need Help?

GET A QUOTE

Finovy Tech Solutions and Core Values

Finvoy%20Tech
Standardized Architecture Design

A modular computer room design with 30% pre-built expansion space, enclosed aisles with heat and cold isolation, and seismic resistance rating of 8.

Finvoy%20Tech
Intelligent O&M Monitoring System

Deploying a DCIM + dynamic environmental monitoring system: Fault warning accuracy increased to 92% Operation and maintenance labor costs decreased by 50% Annual troubleshooting time decreased from 62 hours to 15 hours

Finvoy%20Tech
High availability guarantee

2N redundant power supply architecture Active-active network path design Annual availability: 99.995% (annual downtime: <26 minutes)

error: Content is protected !!