– Production line network delay 500ms
- Server downtime of 58 hours per year
– Operations team is overloaded
deployHuawei network equipment, Dell servers and somePCThe purchase of desktop computers provides reliable infrastructure network construction.
– Core network: Huawei S12700E+ optical modules
– Computing resources: Dell R750+VMware cluster
– Security system: access control + behavior audit
Dimensions | Pre-Transformation | Post-Transformation |
OEE | 68% | 82% |
MTTR | 4h | 0.5h |
TCO | $1.2M | $0.75M |
Customer:
JinkoSolarCategory:
IT TechnologyDate:
2024.08
A modular computer room design with 30% pre-built expansion space, enclosed aisles with heat and cold isolation, and seismic resistance rating of 8.

Deploying a DCIM + dynamic environmental monitoring system: Fault warning accuracy increased to 92% Operation and maintenance labor costs decreased by 50% Annual troubleshooting time decreased from 62 hours to 15 hours

2N redundant power supply architecture Active-active network path design Annual availability: 99.995% (annual downtime: <26 minutes)
Get industry insights, product updates, and exclusive offers – straight to your inbox