-Production line network latency: 500ms
-Annual server failure downtime: 58 hours
-O&M team operating at overcapacity
Deployed Huawei networking equipment, procured Dell servers and partial PC desktops to establish a reliable infrastructure network.
-Core Network: Huawei S12700E + Optical Modules
-Computing Resources: Dell R750 + VMware Cluster
-Security System: Access Control + Behavior Auditing
Dimension | Pre-Transformation | Post-Transformation |
OEE | 68% | 82% |
MTTR | 4h | 0.5h |
TCO | $1.2M | $0.75M |
Customer:
Jinko EnergyCategory:
IT technologyDate:
2024.08
Modular data center design; 30% pre-installed expansion space; enclosed, thermally and cold-isolated aisles; seismic resistance up to level 8.

Deploying the DCIM+ Dynamic Environmental Monitoring System: 92% accuracy rate in fault early warning; 50% reduction in maintenance manpower costs; Annual fault handling time reduced from 62 hours to 15 hours.

2N redundant power supply architecture; dual-active network path design; 99.995% annual availability (annual downtime <26 minutes).
获取行业洞察、产品更新和独家优惠 – 直接发送到您的邮箱